10 Phases of Swimming Pool Construction
About to have a swimming pool? Interesting! Isn’t it? Of course, it is. Undoubtedly, having a swimming pool is fun. But do you know what the procedure of its construction is?
Well, swimming pool construction isn’t a piece of cake. You need to go through a whole procedure to get the one you desire for.
In fact, a good swimming pool has many qualities that one doesn’t even notice while swimming in it. But a builder needs to be an expert in swimming pool contractors in Dubai to fulfill all the requirements.
It’s time to take a deep dive;

10 Phases Of Building A Swimming Pool:
Noticeably, there are 10 main phases of building a pool. Here, I have brought them all for you. Let’s check them out;
1. Make A Plan And Get A Permit:
This is the first and most important thing when you decide to have a swimming pool. You need an engineering plan. Afterward, you need to get it approved by the construction authorities. Once it’s done, then you move on to the next step.
2. Layout:
Now, you have to meet the construction agents and make a layout. It includes the shape, size, and exact location of the pool.
3. Excavation:
Next comes excavation. After you get the permit and make a layout, the excavation team will visit you and dig a hole where you want it. Doing so will move any rock, if it is there in the agreement, to make a perfect dig for the pool.
4. Plumbing:
The next step, in pool construction, is plumbing. Once you are done with all the steps, you need to hire a plumber who makes sure that the circulation of water is fine. As well as that, doing so will also ensure that the pool has clean and filtered water.
In fact, this is very important because if the pool doesn’t have clean water, it may give rise to health issues.
Also, if it is not well-plumbed, you will need a swimming pool company in Dubai every now and then.
5. Steel Structure:
Actually, the steel structure is the outer structure of the pool that gives it strength. It includes rods and bars that will create the structure of your pool according to the engineered plan.
6. Electric And Gas Connections:
Once you have the structure, then you need the connections. The electrician comes and creates connections between the main box, and the equipment according to the plan.
7. Electric Inspection:
This phase requires you to go through the city inspection. A team will arrive at the site and approve the connections. Once they approve, then you can go ahead with the further procedure.
8. Installing Water Features, And Tiling:
At this juncture, your builder will do the tiling around the pool to give it a good finish. It’s up to you how fancy you want it to be.
After the tiling, the water features installation comes. You need to decide what type of features you like. You can have a waterfall, rain descent, water sheer, or deck jets, etc.
It may require time as per your choice.
9. Surrounding Décor:
Once the pool is done, you need to take care of the surrounding area. Notably, there are two options for the surrounding décor. One is concrete, and the other one is pavers. Out of both, pavers are more popular because it adds beauty and durability to the poolside. Moreover, it is maintenance-free and this is what makes it more desirable.
10. Outer Ambiance:
When the pool is done, you have to decide what you want outside. You can have a barbeque set up, or some sunbath setup, or any other thing you want. It’s utterly your choice.

To Wrap Up:
So, these are the 10 phases you have to go through while constructing a pool. If you take care of all these things, you are going to have an amazing pool.
More importantly, you need to hire a construction company that understands your needs and gets you through all the phases with expertise. Plus, a good construction company makes sure the swimming pool maintenance services whenever you need it.